Tel +44 (0)1279 653108

09/09/11
Read how BAUER Technologies, in JV with Keller (BAUER Keller JV) successfully completed the foundation works at the Tottenham Court Road Station Upgrade project for London Underground. The project's success relied upon achieving significant feats of engineering, many of which involved some of the most technically challenging operations ever to have been undertaken in Europe.
View case study >>


01/10/10
Read how BAUER Technologies Ltd successfully completed the main piling works at Pembroke Jetty, Pembroke, for RWE Npower's combined cycle gas turbine power station at Pembroke several months earlier (GE Oct 2009) and as the turbine halls started to take shape the focus turned to the delivery and off-loading of the five 400-tonne turbines and the hundreds of smaller items of mechanical plant arriving by ship from Europe.
View case study >>


01/11/09
Read how BAUER Technologies Ltd tendered, won and delivered the £5 million contract for the installation of the piled foundations for the RWE Npower project in Pembroke, North Wales. Each unit consists of a variety of sub-structures, covering a total area of 40,000sqm.
View case study >>


05/05/09
Read how BAUER Technologies Ltd tendered, won and delivered the Palm Paper Project (Lynn PM7) in Germany, the project is part of a £400 million investment and will house a 10.63m wide paper machine, covering an area of about 4,300m2 with a capacity of 400,000 tonnes per annum of newsprint. All production is made from 100% recycled materials
View case study >>


22/04/09
Read how BAUER Technologies Ltd tendered, won and delivered the £15 million contract for the piled foundation of the Severn Power CCGT Project in Newport, United Kingdom.
View case study >>


03/04/09
BAUER's involvement with the Energy Recovery Facility located at North Quay in Newhaven. The facility is designed to generate electricity from the 210,000 tonnes of residual household waste generated in East Sussex and Brighton & Hove, supplying power equivalent to the energy consumption of more than 16,500 homes.
View case study >>